My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-03_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2003-09-03_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:31 PM
Creation date
11/21/2007 12:48:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Date
9/3/2003
Doc Name
Amendment Application
From
Ducommun Business Trust
To
DMG
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-5- <br />Responsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, there are a <br />number of important requirements which you, as a permittee, should fully understand. These requirements are listed below. <br />Please read and initial each requirement, in the space provided, to acknowledge that you understand yow obligations. Ifyou do not <br />understand these obligations then please contact this Office for a full explanation. <br />~~ `~ 1. Yow obligation to reclaim the site is not limited to the amount of the fmancial warranty. You assume legal <br />liability for all reasonable expenses which the Board or the Office may incw to reclaim the affected lands associated <br />with your mining operation in the event yow permit is revoked and financial warranty is forfeited; <br />~~ 2. The Board may suspend or revoke this permit, or assess a civil penalty, upon a finding that the pemuttee violated <br />the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or that information contained in the <br />application or yow permit misrepresent important material facts; <br />9~~ 3. If yow mining and reclamation operations affect areas beyond the boundaries of an approved permit boundary, <br />substantial civil penalties, to you as permittee can result; <br />~~ 4. Any modification to the approved mining and reclamation plan from those described in yow approved <br />apphcation requires you to submit a permit modification and obtain approval from the Board or Office; <br />~~ 5. It is yow responsibility to notify the Office of any changes in yow address or phone number; <br />~t/ 6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the entrance of the <br />mine site, which shall be clearly visible from the access road, with the following information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado Mined Land <br />Reclamation Board; and, <br />c. the permit number. <br />~~c/ 7. The boundaries of the pemut boundary area must be marked by monuments or other mazkers that are cleazly <br />visible and adequate to delineate such boundaries prior to site distwbance. <br />~/ ~ S. It is a provision of this permit that the operations will be wnducted in accordance with the teens and conditions <br />listed in yow application, as well as with the provisions of the Act and the Construction Material Rules and Regulations <br />in effect at the time the permit is issued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.