Laserfiche WebLink
needed per year. The majority of this material will be obtained from cleanout of the slurry ponds <br />from the prep plant. At least every two yeazs, cleaned material will be respread over regraded azeas, <br />"~ which will then be seeded and mulched. 'T'herefore, approximately 2594 cy will be spread over 6.4 <br />acres per yeaz. <br />Since the plant azea cannot be reclaimed until the end of the mine, the silty material for this azea <br />will be stockpiled as shown on Map C-2. This azea is approximately 10 acres, therefore, 4000 cy <br />will be stockpiled for final reclamation. All fines piles will be constmcted to 2.SH1V slopes and <br />will be seeded and mulched if they aze to be in place over two yeazs. The temporary seed mix for <br />any topsoil or substitute fines piles is given below: <br />The topsoil/fines stockpiles will be seeded with the following seed mix: <br />Topsoil Stockpile Seed Mix Lbs./acre <br />Slender Wheatgrass 10.0 <br />Western Wheatgrass 10.0 <br />Thickspike Wheatgrass 10.0 <br />Crested Wheatgrass 3.0 <br />Perennial Rye Grass 3.0 <br />Cicer Milkvetch 1.0 <br />Utah Sweetvetch 1.0 <br />Total 38.0 <br />1.5 Gold Mine Facilities <br />The gold mine operation will consist of the following facilities: <br />Alma Placer 7/03 18 <br />