My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-09-03_REVISION - M1985029
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985029
>
2003-09-03_REVISION - M1985029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:31 PM
Creation date
11/21/2007 12:48:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985029
IBM Index Class Name
Revision
Doc Date
9/3/2003
Doc Name
Amendment Application
From
Ducommun Business Trust
To
DMG
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The mining timetable for the gold operation is given below: <br />~' Mining Timetable -Gold Operation <br /> <br />Task # Description Time Needed <br />in months <br />1 Strip Initial overburden from Cut 1 and place to the <br />northeast. Regrade this northeast azea. 2.0 <br />2 Mine Cut 1. Create new Pond A. 0.5 <br />3 Mine Cut 2. Very little overburden. 1.0 <br />4 Create 8' gravel berm along Highway 9 ROW 0.5 <br />5 Create Ponds 1,2,3,4 on southwest corner of permit azea 1.0 <br />6 Strip overburden from Cut 3 and place in Cut 1. Move <br />Pond A back to Cut 2 azea. 1.5 <br />7 Mine cuts 4-47 stripping and replacing topsoil & <br />overburden in the previous cut. 64.5 <br />8 Backfill last cut with gravel from Highway 9 berm 1.5 <br />9 Remove all equipment from site 1.0 <br />10 Seed, mulch and place tree saplings in remaining <br />reclaimed azea 1.0 <br /> <br /> TOTAL 74S <br />Since We operation will only be active for 6 months per yeaz, the full gold mining operation will <br />take approximately 12-13 yeazs. <br />Alma Placer 7/03 <br />12 <br />