Laserfiche WebLink
the old piles, the site can be leveled and the processing will also produce a fine material that will be <br />used as a substitute topsoil to revegetate the site. Also, it is desired that a portable concrete plant be <br />brought tb the site for short periods to satisfy specific jobs. The original plan submitted to the town of <br />Alma included the allowance of an asphalt plant on site. The town voiced opposition to this plant, <br />even on a short term basis. In order to cooperate with the town, the permittee hereby states that no <br />asphalt plant will be placed on site at any time without written permission from the town of Alma. <br />For the changes described above, it has been decided to amend the existing gold placer mining 112 <br />permit M-85-029 to include a much larger sand and gravel mining area, to include a portable <br />concrete plant, as well as provide good reclamation standards for all areas re-disturbed. Minor <br />changes to the gold mining operation have also been incorporated into this amendment of August, <br />2003. <br />It is the hope of the Ducommun Business Tmst that the additional gravel mining will restore the land <br />to an attractive, usable condition which is good for the Tmst as well as the town of Alma. The Trust <br />eventually would like to develop those areas reclaimed into a residential area with commercial uses <br />along Highway 9. Some open space with ponds would also be incorporated into the final plan. <br />Alma Placer 7/03 2 <br />