Laserfiche WebLink
`~ - <br />.. ~ . <br />maintain structures as necessary to ensure compliance with <br />applicable requirements. A method of periodically checking the <br />various dewatering devices at the mine could be undertaken. <br />Good Faith $200 <br />The operator exercised good faith in identifying, mitigating and <br />resolving the violation. These efforts began prior to the Division <br />inspector arriving at the site. The operator determined that a <br />problem existed, tested the outflow, and initiated remedial <br />measures. <br />Total Penalty $550 <br />