My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30875
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30875
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:42:48 PM
Creation date
11/21/2007 12:47:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
Enforcement
Doc Date
10/31/1991
Doc Name
ABATEMENT EXTENSION FOR NV C-91-013 BEYOND 90 DAYS SOMERSET MINE FN C-81-22
From
MLRD
To
DAVE BUCKNAM
Violation No.
CV1991013
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- r <br />~ III IIIIIIIIIIilllll <br />STAT~OF GC~LUtcxv~ <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />303 866 3567 <br />FA% 303 832-8106 <br />MEMO <br />TO: Dave Buckram <br />FROM: David B~r~y and Rand rice <br />DATE: October 31, 1991 <br />OF ~~Cp <br />6=' <br />yc/I'~O <br />I`'/ o <br />~ ~~' . <br />~ r8"!6 ~ <br />Roy Romer, <br />Governor <br />Fred R. Banta, <br />Dnision Drtecior <br />RE: Abatement Extension for NOV C-91-013 Beyond 90 Days, Somerset Mine, (File No. <br />C-81-22) <br />Pursuant to Rule 5.03.2(2)(c), we are requesting that the Director extend the abatement <br />deadline for NOV C-91-013 issued to the Somerset Coal Mine, from November 3 to <br />November 14, 1991. This will extend the abatement deadline beyond 90 days and will <br />require the approval of the Division Director. <br />Rule 5.03.2(2)(c)(i) states that an extension beyond 90 days may be granted: <br />Where the permittee of an ongoing permitted operation has timely applied for and <br />diligently pursued a permit renewal or other necessary approval of designs or plans <br />but such permit or approval has not been or will not be issued within 90 days after <br />a valid permit expires or is required for reasons not within the control of the <br />permittee; <br />As an abatement to the violation, the Division required that the mine submit a technical <br />revision and have it approved by November 3, 1991. However, the Division's proposed <br />decision to approve the revision issued October 23, 1991 has been contested during the <br />public comment period and a hearing before the Mined Land Reclamation Board has been <br />scheduled for November 13 and 14, 1991. Since the Board will issue the final decision <br />during the November Board hearing; an extension to the abatement period is requested to <br />this time. <br />RPP/rPP <br />Enclosure(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.