My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30801
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:42:46 PM
Creation date
11/21/2007 12:45:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Enforcement
Doc Date
4/17/1998
Doc Name
ROADSIDE PORTALS PERMIT C-81-041 NOV C-97-016 CO-98-001
From
DMG
To
POWDERHORN COAL CO
Violation No.
CO1998001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
os cow <br />`~`~~`~~ COLORADO DIVISION OF MINERALS AND GEOLOGY <br />•;«~~•~ 1313 Sherman S[reet, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />X816 • <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CO-98-001 <br />MINE: Roadside Portals <br />PERMIT NO.: C-81-041 <br />OPERATOR/PERMITTEE: <br />Powderhorn Coal Company <br />ATTENTION: Howard Abel <br />ADDRESS: P.O. Box 1430 <br />Palisade, CO 81526 <br />DATE ISSUED: January 21, 1998 <br />TYPE OF MINE: Underground/Federal <br />COUNTY: Mesa <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on April 9, 1998, the Division and the operator hereby <br />agree as follows: <br />I. The amount of the penalty shall be $4,400.00 <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from the date <br />this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights to review <br />of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />IF not signed within ten days, the Division will fix the penalty at whatever amount it deetns appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: <br />ay <br />DIVISION OF MINER <br />By <br />By ~C <br />Division Director <br />er ce Offict <br />LS AND GEOLOGY: <br />DATE: <br />DATE: ffo~~Z~, ~S%~ <br />~~-T <br />Penalty Adjustment Reviewed <br />(Rule 5.04.3(4)(c)] <br />C.R.S 34-33-123(8)(c) and (d) <br />M:\OSS\PAIM\TEM P\CN VBJnp I IBM <br />
The URL can be used to link to this page
Your browser does not support the video tag.