Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLD02ER WORK <br />PROJECT IDENTIFICATION <br />Task # : 006 <br />Date : 05/21/2007 <br />User: RCO <br />State :Colorado <br />County :Montrose <br />Siie : Colona Pit <br />Permit/job# : M-1994-005 <br />Abbreviation :none <br />Filename : M005-006 <br />Agency or organization name :DRMS <br />Permit or otherjob action :AM-2 <br />Task description :Spread topsoil on disturbed area (62 ac) <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.24 NA <br /> Operating cost/hour : $73.75 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $164.77 Total fleet cosUhour : $494.31 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 94,000 CCY factor : 1.125 volume : 105,750 LCY <br />Source of estimated volume :62 ac @6" depth <br />Source of estimated swell factor :na <br /> <br />HOURLY PRODUCTION ~ Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job effciency : 0.83 (1shifUday) <br />Partly consolidated stockpile Spoil pile : 0.70 (fnd-mf) <br /> Push gradient : 1.11 (Cat HB) <br />Average push gradient : 5.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,200 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.48 <br />Weight description <br />Earth -Dry packed <br />Adjusted unit production <br />Adjusted fleet production <br />411.00 <br />1,132.99 <br />LCY/hr <br />LCY/hr <br />JOB TIME AND COST <br />Fleet size : 3 Dozers) Total job time : 85.77 Hours <br />Unit cost : $0.401 /LCY Total job cost : $42,396 <br />