My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-05-21_REVISION - M1994005
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994005
>
2007-05-21_REVISION - M1994005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:33:26 PM
Creation date
11/21/2007 12:45:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994005
IBM Index Class Name
Revision
Doc Date
5/21/2007
Doc Name
Cost Summary Form
From
DRMS
To
Operator
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />.............. <br />PROJECT IDENTIFICATION <br />Task # : 003 <br />Date : 05/21/2007 <br />User : RCO <br />State :Colorado <br />County :Montrose <br />Site :Colons Pit <br />Permit/job# : M-1994-005 <br />Abbreviation :none <br />Filename : M005-003 <br />Agency or organization name ;DRMS <br />Permit or other job action :AM-2 <br />Task description. ,;push overburden down slopes to 3:1 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series /l - 8SU (200; Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 7 per day <br />Attachment no. 2 :3-shank ripper <br />Data source : (CRG) <br />Utilization <br />Cost Breakdown ~ Ownership cost/hour : $58.24 NA <br />Operating cosdhour: $73.75 100 <br />Ripper op. cbst(haur : $0.00 0 <br />Operator cbst/hour: $32.78 Nq <br />Total and cosUhour,: $164.77 Total fleet cost/hour : $164.77 <br />........................ <br />MATERIAL QUANTITIES <br />Initial <br />volume : 5,962 CCY <br />Swell <br />factor : 1.125 <br />Source of estimated volume :AM-2 file <br />Source of estimated swell factor : na <br />HOURLY PRODUCTION <br />Average push distance : 60 feet <br />Unadjusted hourly production : 1,246.9 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 25.00 % (r <br />Average site allitude : 6,200 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock, 75% Earth <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Jab efficiency <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 (avg.) <br />7.00 (Cat HB) <br />1.00 (gen.) <br />1.00 (avg.) <br />0.83 (1shift/tlay) <br />0.80 (fnd-rf) <br />1.52 (Cat HB) <br />1.00 (Cat HB) <br />0.87 (Cat HB) <br />1.00 (S/SU/U) <br />0.66 <br />817.27 LCY/hr <br />817.27 LCY/hr <br />_.. <br />JOB 71ME AND COST ~ - - ~ ~ - <br />Fteetsize : 1 Dozers} Total job time : 8.21 Hours <br />Unit cost : $0 202 /LCY Total job cost : $1,352 <br />--~,-( <br />
The URL can be used to link to this page
Your browser does not support the video tag.