Laserfiche WebLink
_. <br />ROADABLEEQUIPMENT ~ sheet2of2 <br /> Nearest major city or town within project area region : Montrose <br />Transoortation Cvcle Time : Non- Total one-way travel distance : 15.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.33 0.33 Total non-roadable mob/demob cost ` : $2,341.38 <br />Return time (hours) = 0.33 0.33 'two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " : $0.00 <br />Unloading time (hours) = 0.50 NA "one round trip, no haul rig <br />Subtotals = 1.67 0.67 <br /> <br />JOB TIME AND COST ~ ~ Total job~time : ~ 3.33 ~~ hours <br /> Total job cost : $2,341 <br />EQUIPMENT HAUL DISTANCE and TIME <br />