Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br /> Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.29 0.29 Total non-roadable mob/demob cost' . <br />Return time (hours) = 0.29 0.29 ' nro round nips wan Haut ng <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost " <br />Unloading time (hours) = 1.00 NA •• one mood idp, no haul dq <br />Subtotals = 2.57 0.57 <br />JOB TIME AND COST ~ Total job time: <br /> Total job cost <br />Fort Collins <br />10.0 miles <br />35.0 mph <br />$1, 757.66 <br />$66.39 <br />hours <br />EQUIPMENT HAUL DISTANCE and TIME <br />