Laserfiche WebLink
-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV-97-010 <br />NATURE OF VIOLATION: <br />Failure to obtain regulator approval for mine site construction activities including si¢nificant excavation <br />of previously undisturbed areas, prior to initiating construction. <br />ACT, REGULATION, OR PERMIT PROVIS[ON(S) VIOLATED: <br />ACT <br />SECTION(S) 34-33-115.34-33-116 <br />REGULATION <br />SECTION(S) 2.08.4(3), 2.08.4(41 <br />PERMIT <br />SECTION(S) <br />PORTION OF THE OPERATION TO WH[CH THIS NOTICE APPLIES: <br />Cut slope above and to the west of Material Storage Bench. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />(l) Cease all unapproved activities at the Material Storage Bench Area. <br />(2) Obtain approval for all unpermitted construction activities at the Material Storage Bench Area prior to <br />reinitiating construction. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE 19 <br />(1) Immediately (7/25/971 <br />(2) August 25, 1997 <br />022IF (3/95) <br />WHITE -File YELLOW -Operator PINK -Specialist <br />