My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-18_REVISION - M1998013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2003-06-18_REVISION - M1998013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:32 PM
Creation date
11/21/2007 12:43:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
6/18/2003
Doc Name
Amendment and all Subsequent Revisions
From
BLC Development Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 19, 1998 <br />Mr. Jeff Gregg <br />Hall-Irwin Construction Company <br />P.O. Box 659 <br />Greeley, Colorado 80632 <br />Re: Augmentation Water for Shores Pit <br />Dear Mr. Gregg: <br />At the request of your engineer, Rocky Mountain Consultants, Inc., I am writing to inform you that <br />Stromquist Farms will agree to provide augmentation water for your substitute water supply plan for <br />gravel mining operations at the Shores Pit. It is my understanding that you need approximately 19 <br />acre-feet per year of replacement water in St. Vrain Creek, approximately one mile east of I-25. <br />Stromquist Farms can deliver this volume of water from Stromquist Pond Nos. 1 and 2 into Boulder <br />Creek below the Rural Ditch to satisfy your water replacement needs. Stromquist Ponds 1 and 2 <br />were decreed in Case No. 88CW219 with three other ponds. The ponds are decreed for <br />augmentation and replacement uses among other water uses, and therefore can be used to replace <br />depletions associated with gravel mining. <br />It is my understanding that gravel mining operations at the Shores Pit may start in August or <br />September of 1998 depending upon when all of the permits are approved. Stromquist Farms will <br />agree to provide water to Hall-Irwin on an annual basis to be released monthly (or at the direction <br />of the Water Commissioner) in an amount equal to depletions as set forth by Hall-Irwin or your <br />engineer, beginning at the time gravel mining commences in 1998. The water lease agreement will <br />be renewable at the option of both Stromquist Farms and Na11-Irwin. <br />Please call at your earliest convenience so we can formalize an agreement. <br />Sincerely, <br />Luke StromquisN' <br />cc: Bob Carlson <br />Mike Ballantine <br />CN1yFiles\OEPT43\Hall Irvrin.agr.ltr.wpd _ _ _ _ _ _ _ . __ _ _ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.