My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-06-18_REVISION - M1998013
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998013
>
2003-06-18_REVISION - M1998013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:32 PM
Creation date
11/21/2007 12:43:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Revision
Doc Date
6/18/2003
Doc Name
Amendment and all Subsequent Revisions
From
BLC Development Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER oe~co~ <br />Division of Water Resources ~~ - e <br />Department of Natural Resources „" <~ao <br />1313 Sherman Stree4 Room 818 <br />Denver, Colorado 80203 - ~ leas' <br />Phone (303) 866-3581 ~ - <br />FAx 1303) 866-3589 <br />' Roy Romer <br />' Governor <br />)amen S. Lochhead <br />Response to Reclamation Permit Application Consideration Executive Director <br />' - Hal 0. Simpson <br />State Engineer <br />TO: Cart B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 5 Water Commissioner <br />FROM: Megan Sullivan, Water Resource Engineer {~'~-~ <br />DATE: May 5, 1998 <br />RE: The Shorgs Pit, File No. M-98-013 <br />Section 1', Twp 2 N, Rng 68 W, 6th P,M., Weld County <br />Operator: Hall-Irwin Construction Co. <br />Contact: Jeff Gregg -Hall Irwin Construction Co. <br />3046 4th Ave, PO Box 519, Greeley, CO 80631 <br />303/654-1634 <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater.. Therefore, exposure of <br />ground water must not occur during or after mining operations: - <br />® The proposed operation will consume ground water by: ®'evaporatioh, ®dust control, ^ <br />reclamation, ®water removed in the mined product, ®processing, ®other: concrete <br />and asphalt production. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is. required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site <br />and document the locations of all wells within 600 feet of the permit area. The applicant <br />must then obtain a waiver of objection from all well owners with wells within 600 feet of the <br />permit area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />
The URL can be used to link to this page
Your browser does not support the video tag.