Laserfiche WebLink
0 to 8 inches of Topsoil <br />0.5 to 8 feet of Overburden <br />20 to 25 feet of sand and gravel <br />resource. <br />RECEIVED <br />DEC 2 2 2003 <br />Division of Minerals and Oeolagy <br />The first step of the m fining process will be the removal of 0 to 8 inches of topsoil. The topsoil will be removed <br />using scrapers, loaders and dump trucks and stored in stockpiles near each of the identified mining phases and <br />will be used for the construction of a permanent seeded visual berm adjacent to the highway. Once the topsoil <br />has been removed, the overburden removal process will begin. As was the case with the topsoil removal, <br />overburden will be excavated using scrapers, loaders, and dump trucks. Overburden will also be stockpiled <br />near the extraction area in separate stockpiles from the topsoil. To prevent erosion, the stockpileswill be hydro- <br />seeded within 12 months of establishment at a rate of 50 bulk pounds per acre. The seed mix consists of the <br />following: <br />Sheep Fescue 10% Pubescent Wheatgrass 10% <br />Crested Wheatgrass 15% Orchardgrass, Paiute 15% <br />Thickspice Wheatgrass 20% Winter Wheat 10°h <br />Slender Wheatgrass 20% <br />Rev. 08/10/03 <br />Subsurface soil conditions. <br />