My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-11_REVISION - M1998014 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1998014
>
2003-12-11_REVISION - M1998014 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:32 PM
Creation date
11/21/2007 12:43:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998014
IBM Index Class Name
Revision
Doc Date
12/11/2003
Doc Name
PAR Response
From
Thomas A. Logue
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Following is an estimate of reclamation vests Bear m mmd that this estimate is based on today's cost and ~s <br />subtect to mllatron and economic fluctuations Changes and rewsbns as a result of the review process to the <br />accompanying reclamation plan may also affect the total cost. <br /> PHASE 18 STAGING AREA <br />ITEM DESCRIPTION UNR OUAN. l TOTAL <br /> PRICE <br />1 Mobil¢ahon <45 mi I LS 5 6,000 00 <br />. <br />2 I Grading and Sloping CY 62,830 5 2.00 125,660 00 <br />3 Place Top Sod CY 39,560 1 50 ~ 59,340 tl0 <br />4 I Seed, Mulch, Tack, & FerM¢e <br />" <br />" AC 31 125.00 3.875.00 <br /> Pd Floor~TYPE <br />A <br />) ~ _ <br />5 ~ Seed. Mulch. Tack, 8 Fertile <br />' AC 6 420.00 2.520.00 <br /> Sde Slopes {TYPE <br />S <br />_ __ _ <br />6 _ <br />DemoJDispose Conc. Batch LS 10,000.00 <br /> Plant Structure <br />6 Demo /Dispose Conc. Batch CY 200 20 00 4,000.00 <br /> Plant Foundatron <br /> <br />7 _ <br />Demo /Dtspose Conc. Batch <br />SY <br />1,252 <br />10 00 <br />12,500 00 <br /> Plant Flatwork <br />. <br />8 F d o./Dispose Asphalt Plant I SY 5.100 5.00 25,500.00 <br /> <br />6 DemolDispose Steel BuNding LS <br />+ 5,000.00 <br />6 _ - <br />Demo IDsspose Steel Building CY 90 2000 1,800.00 <br /> Foun <br />dabon <br /> _ <br />6 , Demo (Dispose Conc Washout CY 200 20.00 4,000 00 <br /> <br />6 Demo /Dispose Conc Fuel i <br />CY <br />20 <br />20.00 <br />400 00 <br />I Containment ~ <br /> _ __ <br /> Subtotal ~ 5260,595.00 <br />9 j Indirect Costs LS 10.500.00 <br /> Subtotal 271,095 00 <br />10 Protect Management LS 18.750.00 <br /> TOTAL PHASE 18 STAGING 5287,845.00 <br />Rev Otl/t 0f03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.