Laserfiche WebLink
The reclamaton plan calls for retummg the disturbed areas. after minurg and reclamaton, to a land use that s <br />"general agricultural'. This land use is consstent with that found m the surrounding area Because of the'dry <br />land- nature of the seed mix presented herein, urgatan o1 the disturbed areas Nell not be attempted <br />The predominate feature of the reclaimed area will be a slat graded area approximately 25 feet below the <br />surrounding undisturbed etevatan A Reclamation Plan Map depicting the confguration of the reclaimed <br />ground surface can be found in Exhibil F <br />Reclamation will be conducted in a phased manner and will start in each phase at the time when the sand anrd <br />gravel resource has been depleted. In other words. reclamaton may happen during the same tune as gravel <br />extraction actrvdies are occurring m each phase. Since no more than 30 acres will be disturbed at one lime <br />Except the staging area, reclamation efforts will begin prior to and smultaneousty with the next sand and gravel <br />removal prceess The initial reclamaton eNorts, cons~s6ng of sloping and grading began durng 200tabng the <br />westerly boundary o1 Phase One Reclamatbn will occur on a 12 to 18 month cycle until all miring acUvrtres <br />have ceased <br />BACKFILLING AND GRADING - As each of the extracton have the resource removed, the backliling and <br />grading activities will commence except for any working gravel Iaces(s) The stockpiled overburden will be <br />hauled from its storage area adjacent to the mining area by mobile equipment and placed where regwred to <br />achieve a level topography and properly backfilled slopes In order to achieve a "natural' appearance the side <br />slopes o1 the extraction they well be re-graded irregular and will range from no steeper than a ratio 01 2:1 <br />(hor¢ontal to vertical) to a rata of 3.1 Approwmately 50 percent of the total length of the slopes Nell be graded <br />to the 2'1 rata. Backfdhng and grading will be done by dozers. andlor, scrapers which will compact and <br />stabile the overburden malarial. To insure stability of the slopes, material wilt be placed in 12 rich lifts and <br />compacted to a minimum density of 85 percent <br />In the event that material delivered to the facility is used in the backfilling and grading operatans, the following <br />procedure will be implemented to insure that the material is clean and inert <br />1, The indivdual or company delivering malertal to the facility is required to sign an affdavtt certdyug that <br />the material is clean and inert. the ongnating source of the material, and the estimated volume. At the <br />drscretbn o1 the facility operator, the certi0cation may also include an BrtvlrOnmental audd of the source <br />sde prepared by a Colorado Registered Professional Engineer or a Registered Environmental <br />Manager. <br />2 During the stockp~Gng process, the facility manager, and those indivduals who operate the stockpiling <br />equipment, will conduct constant visual analysis of the delivered material on a truck by truck basis, At <br />a minxnum, the visual avaluatton will dentAy that [he soil does not have any hydrocarbon <br />contamnatwn, hazardous substances, or other sold waste. <br />3 In the event that contaminated material rs denUhed, all work m the ntmediate area will cease and a <br />Colorado Regstered Professorial Engineer w a Registered Environmental Manager will becorttacted <br />by the facility operator The listed quatihed mdrvdual(s) will prepare, supervise and implement a <br />Remediation and Disposal Plan conducted n accordance with the regwrements of the governing <br />regulatory agenaes <br />TOPSOIL REPLACEMENT -Topsoil replacement will occur in a phase by phase manner using mobile <br />egwpment once all re-grading of the area disturbed by mining is complete Topsoil will be replaced to a <br />thickness of at least 8 riches. which is appropriate to establish vegelaton communRres consistent with the post <br />mine land use <br />RE-VEGETATION -The intent o1 the re-vegetation ~s the establishment of plant communNes consstenl wdh the <br />post-mine land use. After topsoil replacement. seed bed preparation aril stabd¢ation wilt be conducted and will <br />t <br />Rev OtU10N~ <br />