7r <br />The Division issued NOV CV-97-014 on August 14, 1997. <br />4. NOV CV-97-014 cites two regulations that were violated, ?.08.4 and ?.05.3, <br />although both regulations apply to the same issue. The single abatement step was <br />to submit a complete technical revision that addresses all of the desired changes to <br />the facilities configuration, including those changes which have already been made <br />in the field. Because the general area had shown geotechnical instability in the <br />past, and because the Division had requested a geotechnical study of the mine <br />facilities plan during the permit application process, the Division required revised <br />geotechnical studies as part of the abatement for this NOV. The technical revision <br />must provide appropriate demonstrations that the proposed plan meets stability <br />requirements, not only concerning cut and fill operations but, also, the stability of <br />adjacent areas. The technical revision was also to address any alterations to the <br />hydrologic drainage system and the road system associated with the facilities <br />reconfiguration. <br />The abatement deadline was August 29, 1997. There have been two extensions for <br />the abatement deadline, one to September 12, 1997 and the other to September 1 ~, <br />1997. <br />Attached is the NOV folder. If you need any additional information, please let me know. I <br />appreciate your help on this! <br />Attachment <br />cc:\wp61 \bowie2\nov 14pcp <br />