EXHIBIT "L" <br />Reclamation Costs <br />The current Performance Bond is set at .................................................$ 187,217.00 <br />Proposed added Bond as follows: <br />A. Earthwork-Backfilling and Rough Grading. <br />The pit floor will be (2) two foot above the water table at all times <br />during mining. This will be the method until the operator can get <br />an agreement with the ditch company and have an approved <br />water plan from the State Engineers Office. <br />Therefore Rough Grading will be Approx. 6" deep on 35 acres <br />Using $ 0.161 per cyd cost to complete task of moving 28,233 cyd...$ 4,545.00 <br />B. Earthwork-Highwall Reduction. <br />Reduce 12' h max x 3000 LF <br />Using $ 0.50 per cyd cost to complete task of moving 6,750 cyd...$ 3,375.00 <br />C. Not Used <br />D. Not Used <br />E. Earthwork -Ripping. <br />Rip stockpile areas and roads not to remain prior to topsoil <br />Replacement, (1) one foot deep over approx. (8) eight acres. <br />Using $ 250 per acre cost to complete task on 8 arces ....................$ 2,000.00 <br />F. Not Used <br />G. Not Used <br />H. Not Used <br />I. Not Used <br />J. Earthwork Topsoil/subsoil replacement. <br />Replace an avg. of 5" of topsoil over 35 acres assume 1,000 foot haul. <br />Say 25,OOOcyds @ $0.40/cyd .........................................................$ $ 10,000.00 <br />K. Not Used <br />