My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30512
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30512
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:42:40 PM
Creation date
11/21/2007 12:39:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/22/1992
Doc Name
FAX COVER
From
MLRD
To
DEAN MASSEY
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br />March 24, 1992 '~A~1'' ;9~/ <br />..\„i~ i~G :. .. <br />~` ~~~• - <br />Mr. Larry Oehler <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />1313 Sherman St., Rm. 215 <br />Denver, CO 80203-2273 <br />Dear Mr. Oehler: <br />Exhibrt1 <br />fl47iI.E MOUNWN <br />GGLD COMPPM' <br />The approved processing design for the San L is project <br />incorporated the use of a cyanide tailings detoxifica ion system <br />referred to as AVR. The AvR system has been in us since the <br />mill began operating last year and has consistently chieved the <br />pH compliance criteria as set forth in the approved permit for <br />the facility. <br />The tailings pond was frozen over this past wi ter due to <br />one of the coldest winters on record for the San L is valley. <br />This past month as our pond began to thaw, Batt a Mountain <br />Resources' ("BMR") sampling of cyanide concentratio s revealed <br />levels higher than anticipated. <br />BMR believes that an expeditious response to the current <br />tailings pond cyanide levels is appropriate. We propose to <br />reduce the cyanide levels in the pond through the addition of <br />zinc ferrous sulfate. This chemical is commonly used as a <br />cyanide detoxification chemical in the mining Indus ry and the <br />by-products of the detoxification reaction have been emonstrated <br />to be stable and environmentally benign. In ouzo view, the <br />procedure should be implemented as soon as possible) because of <br />the potential attraction of open water to waterfowl during the <br />spring migration. Therefore, BMR intends to comme~ce addition <br />of the zinc ferrous sulfate no later than March 31, 1 92. Please <br />contact me immediately if you have any questions r concerns <br />whatsoever with this proposal. <br />For the longer term, BMR is currently conducting an overall <br />performance evaluation of the AVR system and is determining <br />whether alternative or additional detoxification technology could <br />be appropriate for the facility. We anticipate tha evaluation <br />to be completed on or about May 1, 1992. BMR intend to provide <br />your office with the results of the study along with its <br />conclusions regardinc ^erfc>nance of the s•pstem ar~d potential <br />;a l'I \1'i~R Pff 1]V11 '~~ ~ - ~ ~ ~... .~. -~~. •~.,.n-U. ~nj fPLF\'~;Mu <br />
The URL can be used to link to this page
Your browser does not support the video tag.