Laserfiche WebLink
well has not yet been constructed, Transit Mix and Valco agree to supply Mrs. Helmsing with an <br />interim replacement water supply subject to the terms and conditions of this Agreement. The <br />interim replacement water supply shall be provided within forty-eight hours after notice from Mrs. <br />Helmsing to Transit Mix. <br />a. Interim W ater Supply. If necessary under the conditions described above, <br />Transit Mix and Valco agree, at their sole cost and expense, to connect Mrs. Helmsing to an Interim <br />Water Supply pursuant to the terms and conditions of this paragraph. Transit Mix and Valco may <br />select an Interim Water Supply that (1) provides construction and installation of a water supply for <br />delivery of water to Mrs. Helmsing at the point where the current water line from the Helmsing Well <br />to Mrs. Hehnsing's property enters Mrs. Helmsing's property, (2) provides a quality of water <br />consistent with the average water quality samples taken from the Helmsing Well pursuant to this <br />agreement, and {3) provides water with a pumping head and deliverypressure similar to the pumping <br />head and delivery pressure for the current well. The Interim Water Supply shall provide all pumping <br />facilities, if required, and the pumping power costs shall be separately metered ,unless connected <br />to Mrs. Helmsing's existing electrical supply. In the event the pumping power costs cannot be <br />separately metered or connected to Mrs. Helmsing's existing electrical supply, Transit Mix and <br />Valco shall pay the costs of the pumping power costs. <br />b. Permanent Water Supply. Valco and Transit Mix agree, at their sole cost <br />and expense, to connect Mrs. Helmsing to a Permanent Water Supply pursuant to the terms and <br />conditions of this paragraph. Valco and Transit Mix shat l select a Permanent Water Supply that (1) <br />provides for construction and installation of a water line for delivery of water to Mrs. Helmsing at <br />the point where the current water line from the Helmsing Well to Mrs. Helmsing's property enters <br />Mrs. Helmsing's property, (2) provides a quality of water consistent with the average water quality <br />samples taken from the Helmsing Well pursuant to this agreement, and (3) provides water with a <br />pumping head and delivery pressure similar to the pumping head and delivery pressure for the <br />current well and of a pipe size not smaller than the existing pipe size, but not greater than two inches <br />in diameter. The pipeline to Mrs. Helmsing's property shall also be buried at a depth equal to or <br />deeper than the current depth of the pipeline from the Helmsing Well to Mrs. Helmsing's property, <br />and shad use generally accepted construction practices for installation of the pipeline. The <br />Permanent Water Supply shall include any and all permitting required for the water supply and shall <br />provide all pumping facilities, if required, and the pumping power costs shall be separately metered, <br />unless connected to Mrs. Helmsing's existing electrical supply. Upon providing the Permanent Water <br />Supply, Valco and Transit Mix shall assign the equipment, licenses and permits associated with the <br />Permanent Water Supply to Mrs. Helmsing, and shall convey by Special W arranty Deed an easement <br />in the form of the attached Exhibit A for the right-of--way for the pipeline, power supply and other <br />facilities required for operation, maintenance, repair and reconstruction of the facilities associated <br />with the Permanent Water Supply, to the extent such facilities are not on the Helmsing property. <br />3. Remedies. In the event Transit Mix or Valco fail to comply with the terms ofthis <br />Agreement, Mrs. Helmsing shall have the right to seek remedies pursuant to the February 18, 1986 <br />3 <br />