My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-04-16_REVISION - M1994011
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994011
>
2002-04-16_REVISION - M1994011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:26 PM
Creation date
11/21/2007 12:38:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994011
IBM Index Class Name
Revision
Doc Date
4/16/2002
Doc Name
TR Approval
From
DMG
To
West End Gravel Company
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />SCRAPER • ONLY WORK <br />Agency or organization name : DMG <br />Task#: t1a Stale :Colorado <br />Date : OBy152001 County :Montrose <br />User: SSS Sile: West End Gravel Pit <br />PennB or other Job action : TR-01 <br />Task description : NW Unit - Batkfil/east <br />DOURLY EQUIPMENT COST <br />PermiUjob # : M4894011 <br />AhbreNatbn:none <br />Filename : MOf 1.1 fe <br />Model :Cat 633E Sedes 2 Shia basis : 1 per day <br />Cost Breakdown : Joh utilization % 'Horsepower : 490 <br />Ovmetship cosghour : $79.57 NA <br />Operating cost/hour: 5116.75 100 Weight NST): 56.34 <br />Oparetor cosVhour 828.18 NA Cosl date source : (CRGJ <br />Total unit cosUhour: 5224.50 <br />MATERIAL QUANTITIES <br />Initial Svrell <br />vclume: 25,500 CCY factor: <br />Total Oeal cost/hour <br />Loose <br />1.110 volume : 28,3D6 LCY <br />Source of quantity takeb8:30'H x 510'L hfghwall back011ed ro 3:1 <br />Sours o(eslimaled swell lector :CAT Handbook <br />HOURLY PRODUCTION <br />Haulinc CaoaclW <br />Screoer PeNoad (weich0 Basis : ~ ~ Screoer Bowl (vclumal Basis <br />Notarial descrlp110n : Heaped volume : 34.00 LCY <br />Clay-Natural bad Averege volume: 28.60 LCY <br />Rated payload : 82,000 pounds <br />Payload capacity : 29.29 LCY Adjusted capacity : 28.00 LCY'"' <br />Cycle Time Ooad+haul+soread+return)• Loading time: 0.90 minutes' <br /> Maneuver and spreading time : 0.70 minutes <br />TreV01 time : 'loading Ems per pair on push-pull models <br />Route I Distance (teal) I Grede (%) I Roll. res.(%) I Total res.(%) IVefocity (fpm)I Trevel time (min.) I <br />Haul: 350 0.0 8.0 8.0 767 0.54 minutes" <br />Retum: 350 0.0 8.0 8,0 1,361 Q.41 minutes" <br />navel Ems etljuated for accelerzEOn end tlewleration at loatl and tlump points <br /> Total cycle time : 2,65 minutes <br />Job Condition Correction Factors <br /> <br />Site altitude (feet) : 5,800 Adiusted Hourly Production <br />Altitude adjustment factor: 0.96 (Cat HB) <br />Job efficiency !actor ; 0.83 1 shiR/day) Unadjusted unit production : 672.35 LCY/Hcur"` <br /> Adjusted unit production : 535.73 LCY/Hour <br />Net job correction factor : 0.8D Adjusted fleet production ; 535.7) LCY1HOUr <br /> ••• 2 times volume on push-pull models <br />J08 TIME AND COST <br />Fleet size : 1 Scraper(s) Total job time : 62.83 Hours <br />Unit cost: S0.4f9 /LCY Total job cost: $11,861 <br />
The URL can be used to link to this page
Your browser does not support the video tag.