Laserfiche WebLink
CIRCES Cost Estimating Software <br /> BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 09a .State :Colorado Permitfjob# : M-1994-011 <br />Date : 08/14/2001 County :Montrose Abbreviation :none <br />User : SSS Site :West End Gravel Prt Filename : M011-09a <br />Agency or organization name : DMG <br />Permit or other job action : TR-01 <br />Task description :Feed/ot Unit -Grade and smooth bac~lled west <br />HOURLY EQUIPMENT COST <br />Cast Breakdown <br />Basic machine :Cat 08R - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 ; ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br /> Utilization % <br />Ownership costlhaur : $49.50 NA <br />Operating cost/hour : $85.98 100 <br />Ripper op. cost/hour : $0.75 10 <br />Operator cost/hour : $27.99 NA <br />Total unit cosUhour : $144.22 Totaf fleet cost/hour <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net correction : 0.45 <br />Initial Swell Loose <br />volume: 243 LCY factor: NA volume: 243 LCY <br />Source of estimated volume :Assume 28.5'x 230's/opa graded @ 1 ac. ft. /ac. <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 1, 400.0 LCY/hr <br />Material consistency description <br />Part/y consolidated stockpile <br />Average push gradient : 0.00 <br />Average site altitude : 5,80C <br />Material weight : 2, 800 Ibs/LCY <br />Weight description <br />Clay - Natura/bed <br />$144.22 <br />Source <br />Adjusted unit production : 829.74 LCY/hr <br />Adjusted fleet production : 629.74 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 0,39 Hours <br />Unit cost : $0.229 /LCY Total job cost : $56 <br />Horsepower: 305 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />