Laserfiche WebLink
• ICON Engineenng, Inc • <br />Bull Seep <br />Alt 3-Relocate Bull Seep Off of McIntosh Property <br />Engineers Estimate of Probable Cost <br />Bid <br />Item <br />DESCRIPTION <br />UNIT EST. <br />DUAN. BID <br />PRICE TOTAL <br />PRICE <br />Notes <br />Drop Structure at South Platte <br />1 Mobilization LS 1 E 30,000.00 $30.OD0 (10%Alte <br />2 Erasion & Sediment Control LS 1 $ 10,000.00 $10,000 Estimated <br />3 Water Control &Dewatering LS 1 E 20,000.00 $20,000 Significant <br />4 Seeding (Native) AC 1 E 3,000.00 $3,000 <br />5 Importetl Topsoil CY 50.00 E 15.00 $750 <br />6 Grouted Boulders (aft to 4h) SY 800 00 E 110.00 $88,000 <br />7 Boulders (not grouted) SY 1156 E 80.00 $92,480 <br />8 Type VL Riprap Bedding CY 385 E 45.00 817,325 <br />9 Type VH Riprap Bank Protection CY 400 E 45 00 $18,000 <br />10 Misc. Excavation CY 2500 E 12.00 $30,000 <br />11 Willow Stakes EA 500 E 3.00 $1,500 Estimated <br />$311,055 <br />Bank Stabilization along Bull Seep Slough, North of Howe Pit <br />1 Mobilization LS 1 E 30,000.00 $30,000 (10%Alle <br />2 Excavation 8 Fill along Banks CY 8000 E B.OD $64,000 <br />3 Type L Riprap Bank Protection CY 4556 E 45.00 E205,020 Bank Prole <br />4 Seeding AC 3 E 3,000.00 $9,D00 <br />5 Willow Slakes EA 1200 E 3 00 $3.600 estimated <br />$311,620 <br />Drop Structure at Bull Seep Slough <br />1 Mobilization LS 1 E 10,000.00 $10,000 <br />2 Erosion & Sediment Control LS 1 $ 2,500.00 $2,500 <br />3 Water Control 6 Dewatering LS 1 5 6,000.00 $6,000 <br />4 Seeding (Native) AC 1 $ 3,000.00 E3,000 <br />5 Impartetl Topsoil CY 50.00 E 15.00 $750 <br />6 Grouted Boulders (3tt to Oft) SY 360.00 E 120.00 $43,200 <br />7 Type H Riprap Bank Protection CY 90 E 45.00 E4,050 <br />B Misc. Excavation CY 400 E 12.00 $4,800 <br />9 Willow Stakes EA 100 $ 3.00 $300 <br />874,600 <br />Bull Seep Channel Design (Grass Lined, 200cls Channel, 15•tt bottom, 4:1 SS, $=0.2%, Velr~, <br />1 Excavation with Fill On-site CY 10000 E 8 00 $80,000 <br />~fl/sec) <br />2 Riprap or Rubble CY 3200 E 20.00 $64,000 <br />3 Revegetation LS 1 $ 10.000.00 $10,000 <br />$154,000 <br />Relocate Section o/ Howe Pit <br />1 Importetl Fill CY 36700 E 10.00 $367,000 Assume 4 <br />2 Slurry Wall SF 32500 E 3.00 $97.500 Assume 2 <br />3 Relocate Existing Roadway LS 1 $ 2.000 00 $2.000 <br />8466.500 <br />Sub-Total $1,317,775 <br />Contingency (30 %) $395,333 <br />Total Construction Cast 81,713,108 <br />Spillway ConsWClion, Ea. (430' Long, See Fig. 2.8, Tech. Review Guidelines /or Gravel Mining) <br />1 Excavation 8 Fill CY 1200 E 12.00 $14,400 <br />2 Concrete Culofls CY 480 $ 350.00 $168,000 <br />3 Type M Riprap CY 1900 $ 45 00 $85,500 <br />4 Type M Riprap Grou[ed SY 1700 E 65.00 $110,500 <br />motive Cost) <br />Base Flows Expected <br />mahve Cost) <br />pion Along Entire Reach <br />5' by 20', over 1100-h <br />5' depth over 1300-h <br />430' Long. 25' Crest, 3' Deep <br />Assume 20' tall @ 3'1 slope <br />Assume 12' tall @ 3:1 slope <br />$378 400 each <br />