My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-11_REVISION - M1994080 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994080
>
2006-07-11_REVISION - M1994080 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:41 AM
Creation date
11/21/2007 12:37:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994080
IBM Index Class Name
Revision
Doc Date
7/11/2006
Doc Name
Reevaluate Amount of Required Bond
From
DMG
To
DMG
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatins>I Software <br />Task # <br />Date <br />User <br />003 state :Colorado <br />07/11!2006 <br />ESC <br />County:Larimer <br />Site :Berthoud Sunset <br />Permitfjob# :M-1994080 <br />Abbreviation :none <br />Filename : M080-003 <br />Agency or organization name :DMG <br />Permit or other job action :Reevaluate Amount of Required Bond <br />Task description :R@p/aC@ 6"-10" of So11 over 5 acres <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Serias It - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :1-shank ripper <br />Horsepower: 310 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $54.80 NA <br />Operatingcost/hour: $75.29 100 <br />Ripper op.cost/hour: $0.00 0 <br />Operator cosf/hour : $32.53 NA <br />Total unit cost/hour : $162.62 Total Fleet cosUhour : f 182.62 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,377 LCY factor : NA volume : 5,377 LCY <br />Source of estimated volume :DMG Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 10.00 % (1 <br />Average site altitude : 6,000 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposedrock - 25% Rock, 75% Earth <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.79 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net cortection : 0.34 <br />Adjusted unit production : 289.83 LCY/hr <br />Adjusted fleet production : 289.83 LCY/hr <br />Fleet size : 1 Dozers) Total job time : 18.55 Hours <br />Unit cost : $0.561 /LCY Total job cost : ,f 3,017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.