My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-07-13_REVISION - M2000016 (14)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000016
>
2005-07-13_REVISION - M2000016 (14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:31 PM
Creation date
11/21/2007 12:36:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000016
IBM Index Class Name
Revision
Doc Date
7/13/2005
Doc Name
weld county referral
From
weld county
To
lafarge
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 2, 2005 <br />Ms. Jacqueline Hatch, Planner <br />Mr. Kim Ogle, Planner <br />Weld County Department of Planning Services <br />918 10`h Street <br />Greeley, CO 80631 <br />RE: Use by Special Review Application to mine, process and sell gravel; operate a concrete <br />and asphalt batch plant; and operate a concrete casting facility. <br />LaFarge West, Inc. -Riverbend near Ft. Lupton, Colorado <br />Dear Ms. Hatch and Mr. Ogle: <br />On behalf of Lafarge West, Inc., we respectfully submit this letter and the attached maps as the <br />Use by Special Review Application for the Riverbend project. <br />The proposed Riverbend permit site is located southwest of the State Highway 52 and U.S. <br />Highway 85 intersection, near Ft. Lupton, Colorado. The 1,190-acre site is bound on the north <br />by SH52, east by U.S. Highway 85 and the South Platte River, Weld County Road (WCR) 6 to <br />the south, and WCR 10 to the west. <br />In 2004, Lafarge submitted an amendment to the DMG to consolidate the existing Ft. Lupton Pit <br />(M-1985-088) and Riverbend (M-2000-016) DMG permits, include additional mineable acres, <br />modify the existing mine plan, modify the current reclamation plan, and increase processing <br />capacity at the facility. <br />This Use by Special Review application is being submitted to Weld County in response to the <br />consolidation and expansion of the Riverbend Site boundary. The Site is comprised of 20 <br />parcels owned or leased by Lafarge. The mining will be conducted in 10 Phases; each with one <br />to five associated mine cells. <br />The proposed Riverbend site is partially within the City of Ft. Lupton's Urban Growth Area <br />(UGA). Since the fall of 2004, Lafarge and Tetra Tech RMC have been working with Ft. Lupton <br />to develop plans for Riverbend that respond to the City's concerns (see Figure 1 Opportunity and <br />Constraints Map). Various meetings with City planning staff and the City mayor have <br />influenced details of both the mining and reclamation plans. The reclamation plan incorporates <br />trails, parkland, open space, and potential residential development sites that are consistent with <br />the City's long term goals and objectives. <br />The Use by Special Review application is consistent with the submittal checklist (mining <br />operation). The application contains the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.