Laserfiche WebLink
7. Description of Operation: <br />A. Types and number of operating and processing equipment to be used: Please refer to Special Review Use <br />Questionnaire. <br />B. Maximum number of employees: 40, and number of shifts: 2 <br />C. Number of stages to be worked: 10 ,and period of time each is to be worked: Please refer to the Weld County <br />Questionnaire. Mine Schedule for the period of time each is to be worked. <br />D. Thickness of mineral deposit:. (Average) 29 feet, and thickness of the overburden: (Averagel6 feet. <br />E. This witl be a weU~ pit operation. <br />F. Site entrance/exit points and County roads and bridges to be utilized between site and delivery point(s) <br />(must be coordinated with County Engineer): Please refer to the Traffic Studv prepared by Eugene Coppola <br />and the attached `Weld County Road Access Information Sheets' <br />8. Description of reclamation <br />A. Proposed reclamation land use(s): Lined water storage reservoirs, unlined groundwater-fed ponds and silt <br />basin wetland and upland areas <br />B. Source of technical advice for reclamation: <br />Service, and the U.S. Environmental Protection Apencv <br />C. Explanation of Reclamation Process: Please refer to the Weld County Use by Special Review Questionnaire, <br />Reclamation section and Exhibit E of the attached DMG MLRB 112 Permit Amendment application for a <br />detailed description of the reclamation process. <br />I hereby depose and state under the penalties of perjury that all statements, proposals and/or plans submitted with or <br />contained within this application are true and corcect to the best of my knowledge <br />Rev: 1-27-97 <br />Page-3- <br />