Doc Name
Abatement Deadline Extension Request
From
Seneca Coal Company
To
DMG
Violation No.
CO2003012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E <br />S ~~w~r Seneca Coal Company <br />Apri15, 2004 <br />Mr. Mike Boulay <br />Division of Minerals and Geology Rc p~ <br />1313 Sherman Street, Room 215 c~'C~~~°® <br />Denver, CO 80203-2273 APR <br />D g 2004, <br />~. CO-2003-012 Ab temen Deadline Extension Request o'V 1j~~~ ~t M~"eja~s and ~eplagY <br />Dear Mr. Boulay, <br />Seneca Coal Company (SCC) respectfully requests an extended abatement date for topsoil replacement and <br />seeding at the Valora Pit specified in CO-2003-012. The specified tune fox abatement is on or before April <br />18, 2004. <br />In compliance with the CO-2003-012, SCC has completed backfill and grading activities in the 2001-2002 <br />area shown on Exhibit 19-1A. However, topsoiling and seeding activities cannot be completed due to <br />climatic conditions (i.e. muddy conditions). The topsoiling would require that topsoil be placed over <br />saturated (extremely muddy) spoil and placement by scrapers under these conditions causes deep ruts and <br />unsafe operating conditions. <br />Therefore, under Rule 5.03.2(c) ".....Cirrumrtancer which may guat~ a surface coal mining operatiau for an abatement <br />period of more than 90 dayr are:....'; and specifically with reference to Rule 5.03.2(2)(c)(iv) `inhere climatic caudztionr <br />preclude abatement within 90 days, or where, due to climatic candition.r, abatement within 90 days clearly would cause mote <br />envimnmentalharm than it wouldpreventar;"SCC believes that attempting to place topsoil over saturated regraded <br />spoil would cause more harm. <br />SCC respectfully requests an extension to the abatement date be granted for topsoiling, seeding, and postmine <br />channel construction activities until climatic conditions improve. SCC requests an extension of 90 days until <br />July 17, zoog. <br />If there ate any questions or comments, please contact me at (970) 276-5227. <br />Sincerely, <br />N~i~~ <br />Roy A. Kano <br />Reclamation Manager <br />Seneca Coal Company <br />Seneca Coal Company • P.O. Box 870 • Hayden, Colorado 81839 <br />Telephone (970) 278-3707 • FAX (970) 2783014 <br />