ENFORCE30294
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:37:06 PM
Creation date
11/21/2007 12:34:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Enforcement
Doc Date
11/17/2006
Doc Name
Settlement Agreement
From
DRMS
To
Picketwire Processing, LLC
Violation No.
CV2006003
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />7373 Sherman St., Room 215 <br />Denver, Colorado 80203 C O L D RA D O <br />DIVISION O F <br />Phone: (303) 866-3567 RECLAMATION <br />FAX: (303) 832-8706 MINING <br /> - ~t- <br /> SAF ETY <br /> Bill Owens <br /> Governor <br /> Russell George <br /> Executive Director <br />SETTLEMENT AGREEMENT JUSTIFICATION Ronald w.cattany <br />Picketwire Processing, LLC Division Director <br />New Elk Mine\C-1981-012 Natural Resource Trustee <br />Notice of Violation No: CV-2006-003 <br />James McArdle, Conference Officer <br />Notice of Violation Number CV-2006-003 resulted from a failure to provide an increase in the reclamation <br />bond as outlined in letters dated March 31, 2005, December 20, 2005 and July 19, 2006. The final date <br />for abatement of this violation was September 15, 2006. The abatement deadline was extended twice to <br />September 29 and then to October 27, 2006. Cessation Order C-2006-007 was issued when the October <br />27` deadline for submitting the additional bond was not met. On November 14, 2006, the additional bond <br />was provided to the Division and the Cessation Order was abated. <br />On November 16, 2006, an Assessment Conference was held at the Division of Minerals and Geology <br />office at 1313 Sherman Street, Denver, Colorado. In attendance, in addition to the Conference Officer, <br />was Mr. Kent Gorham representing the Division and representing the operator were Mr. Ronald G. <br />Thompson (Peak Proj. Mgmt), Mr. Wayne Coverdale (NECC) and Mr. Florie Massarotti. <br />Kent Gorham detailed the nature of the violation and the failure of the operator to provide the required <br />additional reclamation bond by the final abatement deadline <br />Ronald Thompson discussed the difficulty that was experienced in working with the bonding company and <br />meeting the bond deadline while also working on the permit transfer particulars. Communications were <br />constant between the company and the Division. Mr. Coverdale stated that reclamation activities <br />continued to proceed from March 2005 until the present. <br />The Proposed Civil Penalty originally determined by the Assessment Officer for CO-2006-003 was: <br />History $0.00 <br />Seriousness (Significant) $1000.00 <br />Fault (Negligence) $750.00 <br />Number of Days Penalty Assessed 1 <br />Good Faith 0 <br />Total proposed penalty $1,750.00 <br />After hearing this testimony and considering the evidence presented, I have come to the following <br />conclusions: <br />History <br />A $0.00 penalty is appropriate for history. <br />Office of Office of <br />Mined Land Reclamafion Ac[ive and Inactive Mines <br />