My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30287
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:37:05 PM
Creation date
11/21/2007 12:34:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Enforcement
Doc Date
3/13/1981
Doc Name
FEBRUARY INSPECTION FN 77-442
Violation No.
CV1993009
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZI. Compliance with Colorado Surface Coal Mining Reclamation Act <br />CRS Z9~3, as amended 34-33-101, et. sue., <br />and the <br />Rules and Regulations Issued Pursuant to the Act <br />This includes a listing of the particular provisions of the regulatory program which were <br />examined during the course of this inspection, and identifies enforcement actions taken <br />during the inspection for failure to comply with the Rules and Regulations, the Act and <br />the permit. <br />4.02 Signs and Markers <br />All required signs are present. New topsoil signs have been placed on the <br />stockpiles at the Cameo mine. <br />4.05 Hydrologic Balance <br />The haul.road and refuse pile low flow bridges have not yet been riprapped <br />and the side plates have not bcenF~rton. Also, tf:e chancel ..as not been <br />widened upstream of the haul road low flow bridge. <br />The diversion channel above the cameo refuse pile has been completed with <br />the addition of the culvert drop structure. Riprap should be placed below <br />the drop structure as an energy dissipator. <br />The emergency spillway at the Cameo refuse pile needs to be riprapped. <br />Also, the gate needs to be put in on the culvert for a primary spillway <br />(dewatering device). <br />4.10 Coal Processing Waste Banks <br />The refuse pile has been graded to the final elevation and fine grading <br />was being done at the time of the inspection. Additional cleanup work is <br />still required along the access road to clean the refuse from the slopes. <br />The rock underdrains have been completed at the Cameo refuse pile. Refuse <br />now covers most of the disposal area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.