My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30287
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30287
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:37:05 PM
Creation date
11/21/2007 12:34:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Enforcement
Doc Date
3/13/1981
Doc Name
FEBRUARY INSPECTION FN 77-442
Violation No.
CV1993009
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Z-'. CompZianee +: th Colorado Surface CaaZ dining Reclama flan Act <br />CRS 1973, as amended 34-33-SO T_, et. sue., <br />and t7e <br />Rv1es and Recvla t: orts Issued Pursuant to the Act <br />This includes a Zisting of the particular provisions of the regulatory program which were <br />examined during the crourse of t(xis inspection, and identif_es enforeemertt actions taken <br />dvr_'nq the inspection for :allure to comoly with the 3v1es and Regv.:at_ons, the Act and <br />the permit. <br />4.03 Roads <br />The roads are being regraded and resurfaced. Later this week 2 [ankerd <br />trucks will apply a chemical dust suppressant to the roads. <br />4.05 }iydrologic Balance <br />Coal fines were observed in the Coal Creek stream channel. This <br />is resultant from the overtopping of material in the dip section <br />of the bridge by the Cameo refuse pile. The ditch from the bridge <br />is blocked which prevents runoff from going into the pond. <br />The operator is installing a culvert below the road which may <br />eliminate the problem of ponding on the bridge. If this culvert <br />is unsuccessful in preventing the ponding on the bridge and the <br />ditch is not maintained a second culvert must be installed from the <br />bridge to the ditch. The material on the bridge must be cleaned away <br />immediately. The coal fines must be removed from Coal Creek, and <br />the ditch from the bridge to the sediment must be cleaned. The inlet <br />to the culvert east of the Cameo office is blocked and must be cleaned. <br />None of the problems relating to hydrologic balance in the previous <br />inspection report had been resolved. <br />The diversion ditch around the Cameo refuse pile was clear. <br />4.10 Coal Processing 4laste <br />and <br />4.11 Progress continues on the Cameo refuse pile. The operator is reminded <br />of the quarterly inspections required by a qualified registered engineer <br />in Rule 1!.10.7. Inspection reports are to be maintained at the <br />mine site. These will be checked during the next inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.