My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30278
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:37:05 PM
Creation date
11/21/2007 12:34:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
Enforcement
Doc Date
6/2/1995
Doc Name
TEN DAY NOTICE 95-020-179-003 COAL RIDGE MINE C-84-065
From
DMG
To
OSM
Violation No.
CV1994028
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c~sm-T ~N <br /> 999 <br />STATE OF <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />131 3 Sherman Si., Room 215 ` <br /> <br />Denver, Colorado 80203 ~ <br />~ <br /> <br />Phone: U03) 8h6~3567 I <br />FAX: 13031832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br />June 2, 1995 Roy Romer <br /> Governor <br />Mr. Arthur W. Abbs, Acting Director lames 5. tochhead <br />p Execmive Direcmr <br />Office of Surface Mining Michael B. Long <br />Albuquerque Field Office Division Director <br />505 Marquette Avenue NW, Suite 1200 <br />Albuquerque, NM 87102 <br />RE: Ten Day Notice 95-020-179-003 <br />Coal Ridge Mine (C-84-065) <br />Dear Mr. Abbs: <br />The Division of Minerals and Geology received the above referenced Ten Day Notice <br />(TDN) on May 26, 1995. A response to the TDN from our office is due by June 6, 1995. <br />Because the TDN arrived on a Friday before a three day weekend, and staff required to <br />prepare a response were involved with meetings at the OSM's Western Support Center this <br />week, additional time is needed to prepare an adequate response. We respectfully request <br />that the due date for receipt of a response be extended until June 9, 1995, as allowed under <br />30 CFR 842.11(b)(1)(ii)(B)(4)(ii). <br />We appreciate your consideration of this matter. If you have any questions, or if this <br />request for additional time is a problem, please contact me. <br />Sincerely, <br />j~~2~ (/ ~ ~~z%~l%~L(lift/ <br />Larry P. Routten <br />Environmental Protection Specialist <br />cc: Barbara Pavlik <br />Susan McCannon ~ <br />c:\wp51\060295 <br />
The URL can be used to link to this page
Your browser does not support the video tag.