Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 003 State :Colorado <br />Date : 01/172007 <br />User: ' RCO <br />County :Fremont <br />Agency or organization name :ORMS <br />Permit or other job action : Conver <br />Task description : Calry <br />Permiujob # : M-1987-027 <br />Abbreviation :none <br /> Utilization <br />Cost Breaktlown : Ownership cosUhour $36.82 NA <br />Operating costlhour : $53.17 700 <br />Operator costlhour : $32.96 NA <br />Total unit cosUhour : $122.96 Total Fleet cosVhour: (122.96 <br />MATERIAL QUANTITIES ~ ~~~ <br />Initial Swell Final <br />volume: 8,065 LCY factor : NA volume: 8,065 LCY <br />Souce of quantiTy take-off :12"depth on 5 acres <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION ~ (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (loatl, dump, maneuver) : 0.600 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : No atljustment -factor not applicable 0.000 (Cat HB/ <br />Stockpile: No adjustment-factornot applicable 0.000 (Cat HBJ <br />Truck ownership: No adjustment -factor not applicable 0.000 (Cat HB) <br />Operation: No adjustment-factor not applicable ~ 0.000 (Cat He) <br />Dump target:No adjustment -factor not applicable 0.000 (Cat HB) <br />Net cycle time atljustment: O.OLlO minutes <br />Adjusted hasic cycle time: 0.600 minutes <br />Rolllno Resistance - Roatl Cond't'ons <br />Haul : Ruttetl dfrf, little mafntenance, no wafer, 2"fire penetration <br />Return : Ruttetl dirt, little maintenance, no water, 2"lire penetration <br />Haul and Retum Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(/) Total res. <br />-(%) Travel time <br />(minutes) Data <br />Source <br />Haul route: 400 5.00 5.00 70.00 0.5102 (Cat HBJ <br />Return route :~ 400 -5,00 5.00 0.00 0.2768 (Cat HB) <br />Loader Bucket Capacity <br />total trevel time : 0.7869 minutes <br />Total cyGetime: y.387 minutes <br />Rated capacity: 7.00 LCY (heaped) (Cat HB) <br />Bucket fll factor: 1.050 Other-moist loam (100-110%) <br />Adjusted capacity: Z3$ LCY <br /> Source <br />Job Condition Correction Factors Altilutle atljustment factor: 1 00 (Cat HB) <br />Site altitude: 8,000 feet Job effciency factor: 0.83 (1 shiNdayJ <br /> Net correction: 0.83 multiplier <br />Unadjusted hourly unit production : 317.87 LCY/Hr <br />Adjusted houdy unit production : 263.92 LCY/Hr (Cat HB) <br />Adjusted houdy Fleet production : 263.92 LCV/Hr <br />JOB TIME AND COST - - -~ <br />Fleet size : 1 Loader(s) Total job time : 30.56 Hours <br />Unit cost: $0.466 /LCV Total job cost: $3,757 <br />