Laserfiche WebLink
.- <br />kerr coal company <br />one tabor center • suite 2500 <br />1200 seventeenth street • denver, Colorado 80202 <br />June 30, 1986 <br />N1N111l11l1111111 <br />(303623-8377 <br />twx 910-937-2561 <br /> <br />e[r. Steven G. Renner JUN 3 01886 <br />Colorado Mined Land Reclamation Division <br />423 Centennial Building ~+~~~ <br />1313 Sherman Street _"".'':~=~~ :=- <br />Denver, Colorado 80203 <br />RE: Final Abatement - Kerr Coal Company NOV-C-88-022 <br />Dear 1(r . Renner <br />Following your phone message of June 17, 1986, I was able to <br />catch our water well consultant and schedule field work aecessazy <br />to abate NOV-C-86-022 prior to his leaving town for vacation. On <br />June 19, 1986, well AO-2 was replaced and sampled. Following are <br />the field data which were obtained: <br />Date 6-19-86 <br />Time 11:30 AY <br />Water Level 5.65 ft <br />Temperature 14°C <br />PH 6.8 <br />E.C. 1500 <br />The sample was delivered to ACZ Inc. Laboratories on the <br />afternoon of June 19, 1986, and the analysis received is this <br />office by telecopy on Juae 27, 1986. As stipulated in NOV-C-88- <br />022, I have attached a copy of the analysis to this letter. <br />These data appear to compare favorably with previous data <br />collected from well AO-2 as evidenced by comparison with the <br />hydrograph presented in our 1985 Annual Hydrology Report. <br />I trust that this simple, yet costly, Cdue to special <br />scheduling problems) submittal satisfies the final abatement of <br />NOV-C-88-022. Please contact me with any questions you may have. <br />Si rely, ~ <br />~~ - ~ , <br />J~••,.~ <br />~~~ - <br />David R. Gossett <br />Chief Mining Engineer <br />DRG\jav <br />cc: George V. Patterson <br />