My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30251
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30251
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:37:04 PM
Creation date
11/21/2007 12:34:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Enforcement
Doc Date
4/16/2002
Doc Name
Settlement Agreement Form & Letter
From
DMG
To
Lorencito Coal Company
Violation No.
CV2002001
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
p4 c0~0 <br />Fe= <br />g <br />~/B!6 <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866-3567 <br />SETTLEMENT AGREEMENT <br />NOV/CO NO.: CV-2002-001 <br />MINE: Lorencito Canyon Mine <br />PERMITNO.: C-1996-084 <br />OPERATOR/PERMITTEE: <br />Lorencito Coal Company, LLC <br />ATTENTION: Bruce Addington <br />ADDRESS: 10500 Highway 12 <br />Weston, CO 81091 <br />DATE ISSUED: February 13, 2002 <br />TYPE OF MINE: Surface/Non-Federal <br />COUNTY: Las Animas <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as required by law, on April 9, 2002, the Division and the operator hereby <br />agee as follows: <br />1. The amount of the penalty shall be $1,800.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />the date this Ageement is signed by ail parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This ageement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below opposite the signature of the Conference Officer. <br />If not signed within ten days, the Division will fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: <br />By <br />DIVISIO OF MINERALS AND GEOLOGY: <br />By l_~a,~'J~-~ ~ <br />Conference Officer <br />By <br />Division Director <br />DATE: <br />DATE: ~ ~- <br />Penalty Adjustment Reviewed <br />[Rule 5.04.3(4)(c)] <br />CRS 34-33-123(8)(c) and (d) <br />C-NV{,1A <br />
The URL can be used to link to this page
Your browser does not support the video tag.