My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-29_REVISION - M2002052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002052
>
2003-05-29_REVISION - M2002052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 10:47:17 AM
Creation date
11/21/2007 12:33:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002052
IBM Index Class Name
Revision
Doc Date
5/29/2003
Doc Name
Cost Summary Form
From
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estlmatina Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATIOb <br />Task it: 004 State:Cororedo Perrnitryobil:M--2002-052 <br />Date : 07/178002 County :Weld Abbreviation :none <br />User : KAP Site : Twv Rivers Pit Filename : MOs?-004 <br />Agency or organization name :Colorado Division OfMinerels And Geology <br />Permit or other job action :Permit Application <br />cask description : Grade hlghwalls <br />HOURLY EQUIPMENT OST <br />Basic marhine : Cet D8R - eSU Horsepower : 305 <br />Blade type :Semi-Universal _ <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :NA <br /> Data source : (CiRG) <br /> UUl izatron % <br />Cast Breakdown : Ownership costRwur : 843.04 NA <br />Operating cosUhour : 865.98 100 <br />Ripper op. costRwur : 80.00 NA <br />Operator cosUhour: 827.99 NA <br />Total unit cosVhour : 8137.02 Total fleet cosUhour : x137.02 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 37,700 LCY tailor: NA votwne: 37,700 LCY <br />Source of estimated volume :Mine Plan Mep, based upon 5 acres of disturtred eras <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION <br />Average push distance : 100 feet <br />Unadjuste0 hourty pmtlugion : 8626 LCY/hr <br />Material consistency description <br />Consolitlated stockpile <br />Average push gratllent : 30.00 % (i <br />Average site attitude : 4,730 feet <br />Material weight : 2,550 (bs/LCY <br />Weigh description <br />Earth -Dry packed <br />,job Condition Correction Factors <br />Operator skill : <br />0.75 Source <br />(avg.) <br />Material consistency : 7,00 (Cat H8, <br />Dozing medgd : 7.00 (gen.) <br />Visibility: 1.fH1 (avg.) <br />Job efficiency: 0,83 (lshi/f/de <br />Spoil pile : 0.80 (Ind-rtJ <br />Push gradient : 7.80 (Cat HB, <br />AHitude : 1.00 (Cat H8, <br />Material weight : 0.80 (CBI HB, <br />Blade type : 7,00 (S/SU/U <br />Net conection : 0.72 <br />I Adjusted unit producion : 613.02 LCY/hr <br />i Adjusted geet production : 613.02 LCYRv <br />JOB TIME AND COST <br />Fleet Size : 7 Dozers) <br />Unit cost: $0.224 /LCY <br />Total job time : 61.50 Hours <br />Total job cost : x8,426 <br />
The URL can be used to link to this page
Your browser does not support the video tag.