Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task no.: 002 <br />Date : 05128/2003 <br />User : KAP <br />Agency or organization name Colorado Division Of Minerals And <br />Permit or other job action :Technical Revision <br />Task description : Dewater pit for grading and liner construction <br />HOURLY EQUIPMENT COST <br /> <br />Description Quantity Data <br />Source <br />Pump : Centrifugal pump, 8.0 in. 1 (CRG) <br />Suction hose : Suction pipe, 8 in. diam., 25 h. L 2 (CRG) <br />Discharge hose : Discharge pipe, 8 in. D, 25 ft. L 1 (CRG) <br />Labor : Pump Operator 1 (CDOT/RSN. <br />Cost Breakdown <br />Ownership cosUhour <br />Operating cosUhour <br />Operator cosUhour: <br />$24.28 NA <br />Total cost/hour : $37.23 <br />Job shift basis : 3 perday <br />Horsepower: 70 <br />Weight (UST) : 1.50 <br />Total fleet cost/hour : $37.23 <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume : 143,200,000.00 gallons <br />Total pond inflow surface <br />area : NA sq. ft. <br />Source of volume estimate :439.55 <br />.............................. <br />PUMPING TIME <br />factor: 1.0000 volume: 143,200,000 gallons <br />Unit inflow rate in Total pond inflow volume <br />gph/sq.ft.: NA per hour: 0.00 <br />on aoolicanfs information <br />Pump efficiency factor : 0.9167 (55 min./hr.) <br />Total adjusted pumping time : 1,249.70 hours <br />JOB TIME AND COST <br />Total job time : 1249.70 hours <br />State :Colorado <br />County :Weld <br />Site :Two Rivers Pit <br />Job Utilization <br />$3.75 NA <br />$9.19 100 <br />Permit/job no.:M-2002-052 <br />Abbreviation :none <br />Filename : M052-002 <br />Unit cost : $0.000325 per gallon Total job cost : $46,523 <br />