My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30175
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30175
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:37:00 PM
Creation date
11/21/2007 12:32:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Enforcement
Doc Date
11/1/1989
Doc Name
TABLE 4.6-54 WATER QUALITY PARAMETERS
Violation No.
CV1994016
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiiiiiiiiiiiuiii <br />999 <br />:, <br />Table 4.6-54 <br />Water Quality Parameters <br />Monitoring <br />Locations: TR-1.5, TR-3, TR-4, WR-1 <br />Chemical <br />parameters: <br />pH Sulfate <br />Tempezature Calcium <br />Specific Conductance Magnesium <br />Orthophosphate as P Sodium <br />Nitrite Manganese <br />Bicarbonate Iron <br /> Water level <br />Monitoring <br />frequency: Com~i its -- 3 times a year <br />Pa ial .ia <br />pH <br />Specific Conductance <br />Temperature <br />water level <br />1st - Approximately 30 days after the first surface water <br />complete list analyses sampling. <br />2nd - Mid sun¢ner (July or August). <br />3rd - Late fall just prior to winter freeze. <br />Par ia~ 1's -- monthly (except during winter freeze up). <br />May or June through October. <br />Monitoring <br />Locations: TR-A, TR-B, TR-C, TR-D <br />Chemical <br />parameters: <br />Temperature Sulfate Temperature <br />pH Bicarbonate pH <br />Specific Conductance Sodium Specific Conductance <br />Total Dissolved Solids Calcium Total Suspended Solids <br />Total Suspended Solids Magnesium Flow (TR-a, TR-b) <br />Orthophosphate as P Aluminum <br />Nitrite Manganese <br />Unionized Ammonia Flow (TR-a, TR-b) <br />Monitoring <br />frequency:~oam~Pt i s -- 3 times a year <br />1st - During spring runoff at the mine site, but prior to <br />runoff upstream (March - April). <br />2nd - Mid summer (July - August). <br />3rd - Late fall just prior to winter freeze. <br />Partial list -- monthly (except during winter freeze up) <br />April through October. <br />4.6-193 <br />November 1, 1989 <br />
The URL can be used to link to this page
Your browser does not support the video tag.