My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30171
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30171
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:37:00 PM
Creation date
11/21/2007 12:32:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Enforcement
Doc Date
7/21/1993
Doc Name
SETTLEMENT AGREEMENT
Violation No.
CV1993045
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Nawral Resources <br />1313 Sherman SL, Room 215 <br />Denver, CO 80203 <br />Phone: (303) 8663567 <br />FA%: (3031 812-8106 <br />Cessation Order No. <br />Mine Name: <br />Permittee: <br />Mailing Address <br />pF COO <br />4~ <br />~e -~ <br />~•/ <br />SETTLEMENT AGREEMENT •1a,6•~ <br />Roy Romer <br />Notice of Violation No. C-93-045 covemor <br />Michael B Long <br />Animas/Helen Permit No.: C-82-055 Division Director <br />Energy Fuels Mining REC~ItI~r <br />P.O. Box 449 <br />Florence, CO 80226 <br />JUL 21 1993 <br />Operator <br />(If Other than Permittee): Oivlsiorol~~~,ne,a,.,«~eulogy <br />Mailing Address: <br />County: Las Animas Type of Mine: Underground/Private <br />The Division of Minerals and Geology ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on June 22, 1993, the Division and the <br />operator hereby agree as follows: <br />1. The amount of the penalty shall be $950.00; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8)(d). <br />. , <br />DATE: 711~~93 c~z~,gH~i~~ls /I'1iru.ut Ca»tR9~n~A <br />OPERATOR <br />By _~ <br />DATE: 7 ~~3 <br />Penalty Adjustment Reviewed <br />CRule 5.04.3(4)(c)j <br />C.R.S. 34-33-123(8)(c)(d) <br />DIVISION OF MINERALS AND GEOLOGY <br />By ~!~-, ~Ih -Cruz-- <br />Conference Officer <br />By ~ <br />Di vi o$ n Di rye-tor <br />8026E/scm <br />
The URL can be used to link to this page
Your browser does not support the video tag.