My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30151
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:59 PM
Creation date
11/21/2007 12:32:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Enforcement
Doc Date
2/7/2007
Doc Name
OSM Inspection Report & Ten Day Notice
From
OSM
Violation No.
TD2007140116001TV1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />CEIVE~ State Program <br />1. Permittee/Person 10~i 9. Permit Number ] 0. Permit Type <br /> BASIN RESOURCES, IN eclamation, C-013-81 PP <br /> 2. Address ~ ~ ping and ba 11. Field Visit Date 12. Purpose 13. SRA Present <br /> 34115 COUNTY ROAD 20.8 02/06/2007 CC N^ <br />3. Ciry 4. State mm - dd - yyyy <br /> <br />CO 14. Permit Status 15. Site Status 16. Facility Type <br />Trinidad IN P2 <br />5. Zip Code 6. Phone Number <br />] 7. OSM Office # 18. CCID # 19. Land Code <br />81082 (719} 846-2427 <br />140 0007-140-001 SF <br />7. Operator Name, if Different than Permittee <br /> 20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> LAS ~ <br />OS <br />02838 C <br /> 1 <br />- <br />O <br />8. Mine Name <br /> 23. AVS Permittee Entity ID Number 24. State Office <br />GOLDEN EAGLE MINE <br /> 056887 <br /> 25. Hours 26. nature Block 27. Reviewin Onictal: <br /> 8.0 a. Permit Review v ~ <br /> , <br /> <br />0 <br />0 <br />b. Site Visit Time Si h'e: Z'I~~o7 <br />AnU T Signature: <br /> . Tnr 1D # 116 <br />HENRY <br /> <br />0.0 <br />c. Travel Time <br />Printed Name: Review Date: 2. l (y /2.667 <br /> mm - dd - yyyy <br /> 2,0 d. Report Writing Date: 02/06/2007 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Interim Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes Item 12 CCR....Citizen Complaint Referral (non site visit) <br />pxx...,Oversight RFx.... Reclamation Fees CC...... Citizen Complaint (initial site visit) <br />Axz.... Assistance Fxx..... Federal Actions CCF.... Citizen Complaint Follow-up <br />Joint Inspection -Item 13 A joint inspection is when a state inspector accompanies an OSM inspector any time during the review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11 (g) <br />ppermined but not yet disturbed. AB1.. good Forfeiture: Bond forfeiture officially in process or completed, and. <br />I N....Inactive (Permanent Program Permit): Phase II completed or ~ reclamation in progress or not yet commenced. <br />Temporary Cessation of Operations, (Interim Program Permit) AB2..Partially Reclaimed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR...Bond Release: Reclamation completed and State Regulatory A63., Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has released all of the bond (Phase III Release.) NA...Not Applicable: When site is unpermitted. <br />Site Status Codes -Item 15 NS.. Non-Site Visit: Status of site not determinetl. <br />ND...No Disturbance: No coal mining and reclamation MC.. Mining Complete: No mining activity on site, FP.. Forfeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaiting phase bond release. actions to revoke the permit, collect the <br />EX..Coal Exploration: Coal exploration operations <br />l minin <br />erations <br />tart <br />nd wh <br />re co <br />o <br />h <br />d TC..Temporary Cessation: The RA has g9ranted <br />cessation of minin <br />ursuant to 30 L'FR 816/ performance band(s), andlor reclama- <br />lion of forfeited site is in <br />r <br />ess <br />g <br />a <br />e <br />p <br />ave s <br />e <br />a <br />have not begun. <br />rf <br />i g p <br />817.131(b). <br />P1 <br />At l <br />t Ph <br />I b <br />tl <br />l <br />Ph <br />I R <br />l p <br />ogr <br />. <br />FR.. Forfeited and Reclaimed: Forfeiture <br />l <br />i <br />l <br />ace min <br />ng <br />AP.. Active Coal Producing: Coal su ase <br />ease: <br />eas <br />ase <br />on <br />re <br />ease <br />e <br />... rec <br />amat <br />on comp <br />eted. <br />activities are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />AN., Active Non-Producing: Active non-producing permits, partial bond release. is permitted but there is no bond. <br />facility such as tipple or pm amtion plant <br />i P2.. Phase II Release: At least Phase 11 bond release WC. Wdtlcat Coal mining and reclamation <br />i <br />t <br />d <br />h <br />i <br />te is <br />NM..No Mining: The Permit Status is active, s e <br />area. <br />for t <br />e ent <br />re perm <br />t operations have or are taking place and <br />not in Temporary Cessation, no surface coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />mining activity, antl site not regraded. the RA has released all bond. required permits from the RA. <br />Facility Type Codes- Item 16 D...Ancillary (Haul <br />S <br />rf roatl, Conveyor, andlor Rails) H...Exploration Permits <br />f I <br />d <br />I <br />N <br />ti <br />t <br />t t <br />I <br />E L... Remining site ppermitted <br />l <br />A... <br />ace E... Refuse andlor <br />u mpoun <br />ment <br />... <br />o <br />ce o <br />n <br />en <br />o xp <br />ore under 30 CFR785.25 <br />B... Underground F... Loading Facility and/or Tipple J... Exemp116 and 2/3 <br />C... Preparation Plant G... Stockpiles K...Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments Are Important <br />The Small Business and Agriculture Regulatory Enforcement Ombudsman and ] 0 Regional Fairness Boards were established to receive comments from <br />sma0 businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each a encv's <br />responsiveness to small business. If you are a small business (a business with 500 0 ^fewe^employees including~those of affiliates) page 1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.