My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30108
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:57 PM
Creation date
11/21/2007 12:31:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
Enforcement
Doc Date
11/1/1999
Doc Name
Comment Letter from Operator
From
ENERGY FUELS COAL INC
To
DMG
Violation No.
CV1999012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii iiiiiiiiiiiiiiir <br />999 <br />a <br />energy fuels coal, inc. -$ <br />.a,nm.w ~~w . poa, cmce nc~ ass . n«axs, eao..do a,as . t~,el ~aa-w9s R F_C E I V F_ ~ <br />October z8, 1999 ~~lOV ~1 999~J' <br />Ms . Sandra L . Brown Division of Minerals 8 Geology <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street - Room 215 <br />Denver, CO 80203 <br />RE: NOTICE OF VIOLATION #CV-99-012 <br />RFRR COAL COMPANY - PERMIT #C-80-001 <br />Dear Ms. Brown: <br />As you and I discussed over the phone, topsoil adjacent to the <br />drainage ditch of your concern was actually stripped prior to <br />disturbance of the area. However, the subsoil from the trench <br />excavation that was piled next to the topsoil berm did spill onto <br />the topsoil berm along a portion of the berm as you stated. I <br />mention "subsoil" to make the point that contamination to the <br />topsoil was not a risk. <br />TOPSOIL: As I mentioned on the phone, the topsoil was salvaged by <br />carefully removing the subsoil from the topsoil and creating a <br />buffer between the two mediums. This was completed October 15, 1999 <br />while I was at the site. <br />DITCH: The drainage ditch was re-established along and adjacent to, <br />the toe of the fill slope immediately after the subsoil cover (cap <br />over the Tipple coal slack) was push/dozed into place. The ditch <br />was completed October 25,1999. Topsoil replacement on the new fill <br />slopes is in progress and is approximately 30$ complete at this <br />time. <br />SEEDING: The disturbed areas adjacent to and east of the re- <br />established ditch at the toe of the fill slopes have been reseeded <br />with the approved seed mix. <br />I trust these procedures satisfy your concerns and justifies <br />abatement of the referenced violation with good faith <br />consideration. <br />Sincerely, <br />~~ rs..-.---~ <br />~'Xge,V. Patterson <br />General Mine Manager <br />cc: James C. Mossman - Kerr Mine <br />
The URL can be used to link to this page
Your browser does not support the video tag.