Laserfiche WebLink
6.4.1? F:X111611 1, Itcclamation ('osts <br />7. In contbmnutcc with Rulc 6.4. t 21 I ), please provide material yuanlities and itemized costs for <br />the following items pertaining to the emh:urkment stabilisation: <br />volume of backlill & grading needed to reconfigure the existing pandirivcrside embankment <br />surface aria of syruhctic filter labric needed hcncath riprap <br />volume of imparted riprap (Type I.) needed <br />volume of imparted riprap Healed 1 I'"diameter) <br />cost fur project supen isiun (rcgistrrrd P.li. or other yualilied pcrstm <br />cost Ibr backlill & girding to final emhankmatt rnnliguration <br />cost fix compaction or finish grading cmbankmcnt, if necessary <br />cost fix liltrr labric <br />cost fur importation of 1'y}x L riprap <br />cost fix importation of 12" diamclcr nprap <br />cast for placcmcnl of 1)pc L riprap <br />cost for placcmcnl of I ~"diamclcr riprap <br />6.1.13 1•:\11161.1 ~I l)thcr Perntih and I.iccnu•s <br />;+. Phase clarify the status of the applic:utt's mapping ut jurisdictional wetlands within or <br />adjacent to t}tc affected land. and the status of their 4114 Permit application with the US r\rnry <br />('ores of lingincen {('Olil, particularly with respect to the proposed plans far till of scvrral ar <br />more wetlands within the pcrntit area. I'Icase affirm whether the applicant has notilial the COf'• <br />ul the proposed bank stabilisation pniject and has submitted a copy o(the proposed stahilization <br />plans fix their rcvicw•. Also, please provide a copy of any written responses received from the <br />('t)F verifying whether a 404, Nationwide or other ('OE permit is needed fur uny of the <br />applicant's proposal activities. Please respond. <br />