My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE30100
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE30100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:57 PM
Creation date
11/21/2007 12:30:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Enforcement
Doc Date
9/20/1993
Doc Name
Settlement Agreement
Violation No.
CV1993103
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ . <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1317 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone:(7031866-3567 <br />FA%:(303)872-8106 SETTLEMENT AGREEMENT <br />Cessation Order No. Notice of Violation No. C-93-103 <br />Mine Name: Deserado Permit No.: C-81-048 <br />Permittee: Western fuels-Utah, Inc. <br />Mailing Address: 405 Urban Street, Suite 305, Lakewood, CO 81244 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: Rio Blanco Type of Mine: Undergound/Federal <br />new ~ ~~ <br />' reyc <br />Roy Romer <br />Gmemor <br />Michael B. Low <br />Divisbn Din!nor <br />The Division of Minerals and Geology ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, on August 31, 1993, the Division and the <br />operator hereby agree as follows: <br />1. The amount of the penalty shall be $500.00; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by .the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8>(d). <br />DATE: <br />OPERATOR <br />By <br />DATE: / 3 By <br />Penalty Adjustment Reviewed By <br />[Rule 5.04.3(4)(c)] <br />C.R.S. 34-33-123(8)(c)(d) <br />8788E <br />DIVISION OF MINERALS AND GEOLOGY <br />
The URL can be used to link to this page
Your browser does not support the video tag.