Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Totat Fteet Size Haut Tdp Retum Tdp <br />Description CosUhour/unit (No. units) Cost/hr/8eet Cosf/hr/fleet <br />-Light Duty Pickup, 4x4, 3/4 T $48.05 1 $48.05 $48.05 <br />-Fuel Tanker 4x2, 170 HP $56.75 1 $56.75 $56.75 <br />-Cube Truck, 4x2, 170 HP $64.65 1 $64.65 $64.65 <br />Subtotals <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Longmont <br />Transoortation Cvcle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haut time (hours) = 0.22 0.22 Total non-roadable mob/demob cost' : $1,990.13 <br />Retum time (hours) = 0.22 0.22 ' Mro round trips with haul rig <br />Loading time (hours) = 1.00 NA Total roadable mob/demob cost " : $75.31 <br />Unloading time (hours) = 1.00 NA "one round hip, no haul ng <br />Subtotals = 2.44 0.44 <br />JOB TIME AND COST Total job tlme : 4.89 hours <br /> Total job cost : 52.065 <br />