My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-03-23_REVISION - M1999063
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999063
>
2007-03-23_REVISION - M1999063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:41 AM
Creation date
11/21/2007 12:29:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999063
IBM Index Class Name
Revision
Doc Date
3/23/2007
Doc Name
Cost Estimate
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software , <br />COST SUMMARY FORM <br />-c~ i <br />PROJECT IDENTIFICATION <br />Date : 23-Mar-2007 ~ Permit or job no.: M-1999-063 r/ Site :Red Wolf Quarry / <br />User : ESC Abbreviation : none State :Colorado <br />Filename : M063-000 County :Ladmer <br />Agency or organization name :ORMS <br />Permit or iob action :Surety Increase <br />... ..... <br />TASK .. <br />LIST (DIRECT COSTS) <br />FORM <br />FLEET <br />TASK <br />DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Grading B Ripping of Disturbed Area dozer 1 10.0 $2,321 <br />002 -Replace Toposoi! on Affected Land dozer 1 6.4 $1,055 <br />003 -Revegetate Disturbed Area revege 2 40.0 $2,045 <br />004 -MobiUzation/Demobilization mobilize 1 4.8 $2,065 <br />SUBTOTALS: 81.29 $7,486 <br />inGudea inflatlon (actor atljusMent of: NA % TOTAL DIRECT COST' $7,488 <br />OVERHEAD AND PROFIT- Llabflity In3UfamCe : 2.02 % Of direct total = $151 <br />Performance bond : 1.05 % o/direct total = $79 <br />Job superintendent : NA` NA NA total = NA <br />Profit : f 0.00 % of direct total = $749 <br />• not required (or eqp. operator serves as super.) TOTAL O 8 P = $978 <br />LEGAL•ENGINEERING -PROJECT MANAGEMENT- CONTRACT AMOUNT (di2ct+08P)= $$,464 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contracUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $423 <br />CONTINGENCY • NA" NA total = NA <br />' conU'ngencies accounted Por a! task level TOTAL INDIRECT COST = $1,402 <br /> TOTAL BOND AMOUNT (direct + indirect) = 58,888 <br />
The URL can be used to link to this page
Your browser does not support the video tag.