Laserfiche WebLink
~- <br />~~Z <br />Mr. Joseph Dudash <br />August 9, 1993 <br />Page Two <br />Given that installation of the berms is an approved drainage control measure, new designs are <br />not necessary and drainage control will be accomplished in accordance wi[h provision b) above. <br />EFMC will implement installation of the berms within 15 working days of receipt of <br />notification from [he DMG that this abatement approach is acceptable. Timely notification will <br />facilitate full abatement within both the extended abatement period as requested by EFMC, and <br />[he regulatory abatement period. The proposed anions should effettively address [he par[ of <br />NOV C-93-087 dealing with the San[a Fe Loadouts. <br />Please feel free [o con[aa me if you have any questions or require clarification relative to the <br />abatement approach or supporting information. We appreciate your consideration and <br />assistance. <br />Sincerely, <br />ACZ Inc. <br />(~~~.~~ <br />~""Thomas E. Leidich <br />Project Engineer <br />~~„%~ 'i~ <br />Jerry .Nettleton <br />Proj Manager <br />TEL;cmc <br />cc: A. Weaver <br />R. Acre <br />P. Goldsmith <br />