Laserfiche WebLink
EXHIBIT D - Minin¢ Plan <br />(a) Description of the method(s) of mining to be employed in each stage of the operation as <br />related to any surface disturbance on affected lands; <br />It is estimated that mining operations will be conducted on the site for ten to fifteen years. The <br />current Hazd Rock Redi-Mix operations at tfie Gray Pit # I (M-2003-092) are under a lease <br />agreement until October I Q, 2007, with an option to renew for an additional five years. Some <br />concurcent reclamation at the site will be done in the western and central area of the permit area as <br />mining is expanded into the additional proposed 5.30 acre extension area. The concurrent <br />reclamation is planned in order to limit the possible increase in the bond amount. Approximately <br />20 acres of the tata123.75 acres will be disturbed and will regn've grading and seeding. The <br />approximate 3.75 acres that will not require reclamation will be the protected areas around the <br />seeps and some perimeter areas to the north and west beyond the site topsoil stockpile area <br />Access to the site is by a private road constructed off Colorado Highway 347 approximately '/: <br />mile to the west. A commercial access at that point has been installed (constructed June 2002) as <br />per required CDOT specifications and agreements between Hard Rock Redi-Mix and Mr. Nick <br />Gray. This road existed previously as a ditch maintenance road and was improved for truck <br />traffic. The road will remain for the landowners continued use after reclamation activities at the <br />site have been completed. <br />The permit area currently operating as the Gray Pit # 1 (#M-2003-092) is a series of small <br />north/south gravel ridges fingering off an east west [rending shale ridge (Mancos Shale) <br />sparsely covered by cedar pinion and sagebrush. The gmveUcobble deposits lie above the <br />Mancos Shale/weathered shale in thicknesses from a few to greater than 50 feet. SoiUtopsoil <br />occurs intermittently across the site from 0 to 60 inches and there is no distinctive overburden <br />between the soil and the gravel deposit. Slopes are steep to very steep (greater than I S%). <br />Current operations at the site are conducting facial extraction of the gravel deposits off the <br />slope after reserving existent topsoil in the westside topsoil stockpile area. The remaining site <br />gravel deposits (reserves) are mostly located adjacent to and within the proposed 5.30 acre <br />extension area along and above the current permitted northern boundary of the site. The <br />purpose of this revision is to develop the additional gravel deposit north of [he current <br />permitted area. Reclamation at the site will also be enhanced by the proposed expansion <br />area as the east-west ridge can be more effectively contoured and sloped to match the <br />existing topography. Steep reclaimed slopes and remnant highwall segments will be <br />avoided as the ridge can be graded and sloped of both side. In the current active area, there <br />is no overburden or waste rock to be removed above the gravel [o be mined. There is some <br />overburden 5.30 acre extension area. Overburden is mostly sandy loam topsoil which will be <br />moved and used to slope and cover areas to be reclaimed concurrently as the extension and <br />ridge-top areas are mined The 5.30 additional acres to be added will be marked and staked <br />using steel posts and other delineation as is used for the current permit boundary. <br />The site as mapped and described by the U.S.D.A. Soil Conservation Service report of June 4, <br />200 ],consists of eroded stream terraces with a skeletal overburden of soil. Soils on the site <br />range from 0 to 60 inches and are described as Steep Shallow Clay Loam P.J. Gravel/cobble <br />till deposits underlie the surface soils from a few feet to over 50 feet in thickness along the <br />north/south [rending ridges. An advance copy of [he current NRCS/USDA soil type and site <br />inspection records for the Gray Pit #I are attached In Exhibit I. <br />As is being done for the current permitted activities at the site, topsoil will be stripped and <br />stockpiled at the Westside topsoil s[ocl~ile area for use in subsequent reclamation activities. If <br />topsoil stockpiles are to be left for more than !growing season, they will be seeded with the <br />USDA recommended seed mix via broadcast method. <br />