Laserfiche WebLink
-s- <br />9. Annually, on the anniversary dace of permit issuance, you must submit an annual <br />/"II~ fee (51,000), and as annual report which includes a map describing the acreage affected <br />6: and the acreage reclaimed to date (if there are changes from the previous year), any <br />monitoring required by the Reclamation or finvirpameatal Protection Plans to be <br />submitted annually on the aani.versary date of the permit approval. Annual fees aze for <br />the previous yeaz a permit is held. For example, a permit with the anniversary date <br />of July 1, 1995, the annual fee is for the period of July 1, 1994 through June 30, <br />1995. Failure to submit your annual fee and report by the permit anniversary date may <br />result is a civil penalty, revocation of your permit, and forfeiture of your financial <br />warranty. It is your responsibility, as an operator, to continue to pay your annual <br />fee to the Office until the Board releases you from your total reclamation <br />' responsibility. <br />~ 10, For ioint venture/partnership operators: the sigai.ng representative is authorized <br />1' to sign this document and a power of attorney (provided by the partner(s)) authorizing <br />the signature of the representative is attached to this application. <br />