Laserfiche WebLink
<br /> <br /> <br />5. Emissions from the Dore furnace into the air. <br />6. Proof of air emission permit requirements being met. It is <br />unresponsive of MLRD to claim it has no jurisdiction in this area <br />if, in fact, MLRB has the power to make the final decision on the <br />granting of the permit. <br />7. Public access to monitoring systems. <br />8. Inadequate emergency response plan in the event of a spill. <br />9. Status of water rights for the project. <br />10. Unsafe leak detection monitoring system. <br />11. The peak storm data of 2.96 inches of rainfall per 24 hour <br />period is too low. <br />12. The chemical composition o£ the slurry-form tailings. <br />13. The effects on the Rito Seco Creek of the East Pit Wall, and <br />the rock disposal sites because of their proximity to the Rito <br />Seco. <br />14. Monitoring system for the milling process which will <br />guarantee no leakage of the cyanide solutions. <br />Please feel free to contact me if you have any questions. <br />Noxa Jacquez, Ph.D. <br />Attorney at Law <br />