My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE29881
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE29881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:36:47 PM
Creation date
11/21/2007 12:24:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Enforcement
Doc Date
12/6/1996
Doc Name
SENECA II-W MINE C-82-057 NOV C-95-023 EXTENSION OF ABATEMENT DEADLINE BEYOND 90 DAYS
From
DMG
To
MIKE LONG
Violation No.
CV1995023
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 05 '96 10~57RM PERBODY WSTN SENECR MINE <br />P.1 <br />Seneca Coal Com <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman street, Room 215 <br />Denver, CO 80203.3273 <br />December 5, 1996 <br />RS: Seaeca II.1P Dins Permit C•83.057, NOv C-95.033 <br />Dear Ms. Crosby: <br />This correspondence is a request for an extension of time for the <br />abatatnerit of NOV C•95-023 to the Seneca Z2•W Mina Permit C-82-057. <br />The current abatement deadline for this NOV is Monday, aecember <br />9th. <br />Seneca has initiated the field implementation of the abatement <br />plans approved in Technical Revision No. 25. We have removed the <br />topsoil over the area which seeds to be regraded. Seneca still <br />needs to get the final slope back to a 3:1, replace the topsoil and <br />revegetate the redisturbed acreage. Also some additional drainage <br />work needs to be redone. Because o£ the weather and ground <br />conditions over the last two months this work has not been able to <br />progress a8 anticipated. The ground has been wet and very muddy and <br />detrimental work has occurred each time we have had a bulldozer <br />start cutting this slope flown. Mobile equipment operator safety on <br />this slope is also a concern at the present time. Unfortunately, <br />the window for topsoil replacement and revegetation activities has <br />passed us. To complete the entire abatement plans will take us into <br />the spring of 1997 when all snowmelt has taken place. I am asking <br />for a 90•day extension of the current deadline to March 9th. <br />Should you or any other members of the Division have any questions <br />regarding this information, please do not hesitate to contact me. <br />in ~.~:. A:'l <br />~~ w <br />POBtyt• Fax Note 7871 <br />Daa ~ Q; <br />payge- <br />To ~ y From MI T]qV~ <br />CoJDepl, Co. ``.. <br />•~CN <br />L . <br />Phone k Phano <br />Fax Y ex N <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt (PWCC) <br />Sanxa Coal Company • P.O. Drawer D • Naydan, Colorado e~63e <br />Telephone (970) 278.3707 • FAl( (970) 276-0014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.